Settling Basin
The settling basin is designed to trap 90% of 0.40mm size particles. As per design construction work of settling basin is in progress. Excavation work for required size is completed and also construction in transistion portion is completed and main body is completed and construction of pond is also completed and the construction of hooper wall is going on So it takes about 95% of total settling basin construction works.
- Function: Designed to trap 90% of 0.40mm size particles.
- Current Status: 95% completion of total construction.
- Completed Works: Excavation, transition portion, main body, and pond construction.
- Ongoing Work: Construction of the hopper wall is in progress.