The Project · Sindhupalchok, Nepal

Balephi-A Hydropower Project

A 22.14 MW run-of-river scheme on the Balephi Khola in Sindhupalchok District, designed to generate about 125 GWh a year for the national grid.

Design Discharge
32.40 m³/s
Mean Annual Energy
125.3 GWh
Gross / Net Head
86 m / 81 m
Installed Capacity
22.14 MW

How It Works

From River to National Grid

Water is taken from the Balephi Khola at the weir, cleaned in the settling basin and carried more than 3 km by canal and steel pipe. From the surge tank it drops 86 m through the penstock to the powerhouse, and then returns to the river.

How the Balephi-A Hydropower Project works Profile of the scheme: the diversion weir turns the river into a side intake and settling basin, a headrace canal carries the water to the forebay, and a headrace pipe takes it to the surge tank. From there the penstock drops to the powerhouse, the tailrace returns the water to the river, and a transmission line carries the power to the grid. 86 m gross head 1 2 3 4 5 6 7 8 9 10

Swipe to see the whole scheme

  1. 1

    Diversion Weir & Intake

    33 m ogee weir · crest at 912 m

    A 33 m ogee weir raises the river and turns up to 32.4 m³/s into a side intake with five openings. Two hydraulic gates flush gravel and silt past the weir.

    Construction100%
    Latest update
  2. 2

    Settling Basin

    2 basins · 107 m × 22.5 m

    After a gravel trap and an 82 m approach canal, the water slows down in two surface basins so fine sand settles out before it reaches the turbines.

    Construction100%
    Latest update
  3. 3

    Headrace Canal

    ~948 m · 4.7 m × 3.5 m

    A concrete-lined box canal carries the water along the hillside at a gentle gradient to the forebay.

    Construction95%
    Latest update
  4. 4

    Forebay

    20 m × 5.7 m × 10.7 m

    Steadies the flow and feeds it smoothly into the headrace pipe.

    Construction100%
    Latest update
  5. 5

    Headrace Pipe

    2,281 m · Ø 3.8 m steel

    A 3.8 m steel pipe, buried in places and on the surface in others, carries the water from the forebay to the surge tank.

    Construction70%
    Latest update
  6. 6

    Surge Tank

    Circular concrete · Ø 12.3 m

    Absorbs pressure surges when the turbines start, stop or change load, protecting the pipe and penstock.

    Construction100%
    Latest update
  7. 7

    Penstock

    803 m · Ø 3.8 m steel

    Drops the water to the powerhouse, building up the pressure that drives the turbines.

    Construction60%
    Latest update
  8. 8

    Powerhouse

    3 × 7.38 MW Francis · 86 m gross head

    A 55 m × 18 m surface building housing three Francis turbines, each driving a 7.68 MVA generator.

    Construction95%
    Latest update
  9. 9

    Tailrace

    ~115 m covered canal

    Returns the water to the river below the powerhouse.

  10. 10

    Transmission Line

    9 km · 33 kV double circuit

    A 33 kV double-circuit line carries the power to NEA’s Pangtang substation.

    Construction67%
Location map of the Balephi-A Hydropower Project in Sindhupalchok

Project Location

Balephi Rural Municipality, Sindhupalchok

The project lies in Balephi Rural Municipality (the former Golche and Selang VDCs) of Sindhupalchok District, Bagmati Province, between latitudes 27°50′48″N and 27°51′42″N and longitudes 85°45′00″E and 85°46′31″E.

Access is by road from Balephi Bazaar to Naubise and on to Kumeshwor.

90.58%

As of August 2026

Overall Physical Progress: 90.58% complete

See Construction Progress

Salient Features

Technical Specifications

Location & Type

District
Sindhupalchok, Bagmati Province
River
Balephi Khola
Municipality
Balephi Rural Municipality (former Golche and Selang VDCs)
Latitude
27°50′48″N – 27°51′42″N
Longitude
85°45′00″E – 85°46′31″E
Type of Plant
Snow-fed run-of-river

Hydrology & Energy

Catchment Area at Intake
542.65 km²
Design Discharge
32.40 m³/s
Probability of Exceedance
40%
Design Flood (1 in 100 yr)
2,008.2 m³/s
Design Flood (1 in 200 yr)
2,363.5 m³/s
Mean Annual Energy
125.3 GWh
Dry / Wet Season Energy
37.4 GWh / 87.9 GWh

Headworks

Diversion Weir
Ogee type with bottom under-sluice
Weir Crest Level
912 m
Weir Length / Height
33 m / 7 m above riverbed
Under-sluice Gates
2, hydraulically operated
Intake
Side intake, 5 openings of 5.1 m × 2.1 m with coarse trash racks
Intake Invert Level
909.80 m
Gravel Trap
Concrete-lined trapezoidal chamber, ~18 m × 16 m × 10.5 m

Settling Basin

Type
Surface, 2 basins
Effective Size
107 m × 22.5 m × 8.5 m
Particle Size / Trap Efficiency
0.20 mm / 90%
Flushing
Gated pipe, Ø 0.90 m

Waterways

Approach Canal
Concrete box canal, ~82 m, 4.5 m × 3 m, slope 1:500
Headrace Canal
Concrete box canal, ~948 m, 4.7 m × 3.5 m, slope 1:1000
Forebay
Surface concrete, 20 m × 5.7 m × 10.7 m
Headrace Pipe
Steel, Ø 3.8 m, 2,281 m
Surge Tank
Circular concrete, Ø 12.3 m × 16 m high
Penstock
Steel, Ø 3.8 m, 803 m, 12–22 mm thick

Powerhouse & Grid

Powerhouse
Surface, 55 m × 18 m × 14.81 m
Gross / Net Head
86 m / 81 m
Installed Capacity
22.14 MW
Turbines
3 Francis units of 7.38 MW, 750 rpm
Generators
Brushless synchronous, 7.68 MVA, 11 kV
Transformers
2 three-phase outdoor, 6.6/33 kV, 50 Hz
Tailrace
Covered rectangular canal, ~115 m, 5 m × 2 m
Tailwater Level
826 m
Transmission Line
33 kV double circuit, 9 km to Pangtang substation

Key Facts

Licences, Contracts and Finance

Licences & Dates

Company incorporated
13 July 2006
Generation licence
19 April 2015
Financial closure
2 July 2021
Public limited company
15 July 2022
Commercial operation
To be announced

Power Purchase Agreement

Buyer
Nepal Electricity Authority
Signed / amended
30 Oct 2012 (10.6 MW) / 28 Dec 2020 (+11.54 MW)
Term
30 years from commercial operation
Tariff
Rs 8.40 per kWh dry season, Rs 4.80 wet season
Contracted energy
124.56 GWh a year

Finance

Project cost
Rs 6,216 million (revised, about Rs 281 million per MW)
Funding
65% bank debt, 35% equity
Bank facilities
Rs 4,070 million (Rs 3,404 million term loan + Rs 666 million proposed), rated CARE-NP BB-
Source
CARE Ratings Nepal, December 2025